KitLog pro

Powered By Kitlog Pro v2.0

Buds Web Site
Work Logs Found: 130
Category Work Time: 672 Hours
 Date
Hours
Work Log Summary

Details

 10-29-2010
0.20
Advice from other builders
Details

 10-06-2010
8.00
finishing the brake lines.
Details
       

 10-03-2010
10.00
Install rudder pedals, brake cylinders, steel tubi
Details
       

 09-07-2010
0.50
Pilot and passenger seats
Details
     

 09-07-2010
2.10
Finishing installation of aft window.
Details

 09-06-2010
3.20
continuing attaching aft window
Details

 09-05-2010
5.30
Aft Window
Details

 09-03-2010
2.80
Riveting
Details

 08-30-2010
0.40
Plastic back window
Details
     

 08-29-2010
53.00
Lots of Rivets
Details
     

 08-27-2010
34.00
Continuation of melding empennage to fuselage
Details
     

 08-26-2010
3.00
joining tailcone and fuselage' snap bushings"
Details
       

 08-24-2010
0.20
Bend Tabs
Details

 08-23-2010
4.00
Remove empennage assemblies from Tailcone
Details

 08-22-2010
35.00
Finishing section 24. Dissappointment at 25.
Details

 08-20-2010
2.00
attaching nut plates to bulkheads and Channels
Details
     

 08-18-2010
4.00
Redo of roll bar. Match drill Shear Clips
Details

 08-17-2010
5.00
Odds and Ends
Details

 07-24-2010
1.20
Riveted nutplates to tailcone
Details

 07-23-2010
2.00
Nutplates clecoed to the tailcone assembly
Details

 07-21-2010
3.00
Preparing the attatchments of the tail cone to the
Details

 07-12-2010
1.50
Continuing with fairing after attaching Stabilator
Details
       

 07-08-2010
3.00
Working with the tail cone fairing.
Details

 07-04-2010
3.00
Re-attaching the stabilator to the tail cone
Details

 06-17-2010
5.00
Tail cone fairing continued...
Details

 06-15-2010
5.00
More tail cone fairing
Details

 06-12-2010
3.00
Tail cone fairing fabrication
Details
       

 05-25-2010
2.50
Fabrication of tailcone fairing
Details

 05-10-2010
3.00
V-Stab Fairing match drilled and clecoed
Details

 05-07-2010
2.50
Fitting the V-Stab close to the aft part of the ru
Details

 05-05-2010
2.00
removing extraneous polyester from rudder tip fari
Details

 05-03-2010
2.50
Continuing torture of removing assemblies

 04-30-2010
3.00
Masking,3/4 drilling of fiberglass tail cone fair
Details
       

 04-29-2010
1.00
Re attaching the V-stab to the tailcone
Details

 04-28-2010
2.00
fitting fairings for V-stab and Rudder
Details

 04-23-2010
2.00
Working with fiberglass
Details

 04-19-2010
4.00
Re do and Re-re do
Details

 04-17-2010
4.00
Screwing skins and tightening bolts
Details

 04-07-2010
2.00
Testing the AST Assembly Travel
Details

 04-03-2010
4.00
Trim/Servo Assembly Installation
Details
       

 03-22-2010
3.00
Comparing parts with packing list
Details
       

 03-20-2010
1.00
Parts fabrication
Details

 03-20-2010
1.00
Deburring, placing and sanding gromets
Details

 03-18-2010
4.00
Stabilator Counterbalance and Attachment
Details

 03-18-2010
1.50
Anti-servo assembly attached and wired
Details

 03-15-2010
4.00
Installation of V-Stab and Rudder.
Details

 03-15-2010
0.00
Fun with the computer
Details

 12-10-2009
6.00
Riveting continues
Details

 12-04-2009
2.00
Rivets, rivets, everywhere and Coleridge not aroun
Details

 12-03-2009
6.50
Clecoing and Riveting skins
Details
       

 11-30-2009
3.00
placing, clecoing, riveting; 1279, and 1280 skins
Details

 11-29-2009
1.00
Using a Cushion Clamp to route the WH-P30
Details
     

 11-20-2009
2.00
Chaffing resolution
Details

 11-16-2009
2.30
The Static Air System
Details
       

 11-13-2009
3.00
wiring and stringing
Details
       

 11-11-2009
2.00
Pneumatic Riveting
Details

 11-11-2009
3.50
Frames (like scrawning bulkheads) & Skins
Details
     

 11-09-2009
3.00
Stabilator Hinge Washers assembly
Details

 11-05-2009
4.60
Finishing the F-1211 Assembly
Details

 11-03-2009
2.30
Initial preps of eventual F-1211 Assembly
Details

 11-02-2009
2.50
Fabrication and Bulkhead doubler prep
Details

 10-31-2009
3.00
Fuselage Frames
Details

 10-30-2009
1.00
Hard Drive fatal crash
Details

 04-19-2009
1.50
Joining the fuselage to the firewall
Details
       

 04-18-2009
4.00
Steps and a fabricated bracket
Details
       

 04-17-2009
6.00
firewall and firewall shelf
Details

 04-13-2009
3.00
Tunnel assembly
Details

 04-10-2009
3.00
More lower firewall
Details

 04-03-2009
4.00
Firewall blues
Details

 03-28-2009
2.00
Nothing much different here
Details

 03-26-2009
0.20
Twisted wires
Details
       

 03-24-2009
4.00
Mostly Seat backs
Details
       

 03-23-2009
3.00
Facet Pump Brackeet; Block Studs
Details

 03-22-2009
1.50
Baggage bulkhead
Details

 03-14-2009
4.00
Lower forward fuselage
Details

 03-13-2009
1.00
This and that
Details

 03-13-2009
4.00
Re-do's and steps
Details

 03-05-2009
2.00
seatbacks
Details
       

 03-03-2009
4.00
Seat back
Details
       

 03-01-2009
3.00

Details

 02-16-2009
2.00
New brackets for a trapped bearing
Details

 01-09-2009
2.00
Re-do redux
Details

 01-08-2009
3.00
Re-do Column Control
Details
       

 01-02-2009
8.00
Mostly skinning the fuselage bottom
Details
       

 12-30-2008
8.00
Seat and Floor of cockpit
Details
       

 12-24-2008
3.50
Riveting stuff to the bulkhead
Details
       

 12-23-2008
6.00
Not enought, too much; not enoug...
Details
       

 12-22-2008
4.00
Small parts and tails.
Details
       

 12-07-2008
2.00
Preparing Parts.
Details
       

 12-06-2008
4.50
The floor of the cabin
Details
       

 12-05-2008
6.50
Where the pilot sits.
Details
       

 12-01-2008
5.50
Nutplates can make you Nuts!
Details
       

 11-26-2008
4.00
Flaperon mixer arm & seat ribs
Details
       

 11-25-2008
6.00
Pull-thru rivets
Details
       

 11-24-2008
3.00
baggage compartment.
Details
       

 11-11-2008
5.50
assembling baggage floor and ribs
Details
       

 11-07-2008
8.00
Assembly of Center Section Bulkhead
Details
       

 10-28-2008
6.00
Wings, Inventory done. Bulkhead started
Details
       

 10-26-2008
4.00
Inventory of small parts
Details

 10-25-2008
4.00
inventory
Details

 10-22-2008
96.00
Finishing the wings and flaperons.
Details

 07-12-2008
7.00
Cleco and Rivet inboard bottom skin
Details
       

 07-09-2008
25.00
Pulled Rivet removal education.
Details

 06-23-2008
3.00
Fix stall warning device.
Details
       

 06-17-2008
3.50
Building a Stall Warning.
Details
       

 06-14-2008
2.50
Redo with one new rib, and an old one.
Details

 06-05-2008
3.00
Correcting a mistake, understanding Section 16
Details
       

 06-04-2008
6.00
Nose Ribs prepped, clecoed, and riveted to Rt main
Details

 06-03-2008
5.50
Riveted main ribs to right main spar
Details

 06-01-2008
10.00
Prepared, assembled and riveted Nose Ribs
Details
       

 05-30-2008
8.00
Main Ribs prepared and partially riveted to main s
Details
       

 05-28-2008
4.50
trimming main ribs. starting some assembly
Details

 05-27-2008
4.00
Main Ribs
Details

 05-26-2008
4.00
Deburring ribs and figuring out Nutplates.
Details

 05-25-2008
5.00
Tapped upper end of AEX's. Prepared Nose Ribs
Details
       

 05-23-2008
2.00
straitening more ribs
Details

 05-22-2008
1.00
Drill and Tap AEX tiedown
Details

 05-19-2008
4.00
Finished riveting rear spars, began "fluting" ribs
Details
       

 05-18-2008
3.00
Rear Spar, Spar Doubler, Flaperon Hinge Assembly,
Details
       

 05-16-2008
2.00
deburring doublers, riveting Flaperon Hinge
Details

 05-15-2008
2.00
Riveting Flaperon Hinge Assembly
Details

 05-14-2008
4.00
Countersink 120 degree Stub Spar Ass. Flange. Sque
Details

 05-13-2008
2.00
Hinge assembly (2) preparation
Details

 05-12-2008
2.00
Hinge Bracket Assembly
Details
     

 05-11-2008
3.00
Countersink stub spar assembly, prepare flaperon
Details

 05-09-2008
3.00
Riveting attach angles to spar
Details
       

 05-08-2008
4.00
Fabrication and clecoing wing spar
Details

 05-07-2008
4.00
reading, studying, starting
Details
       

 05-06-2008
3.00
Uncrating and unpacking
Details
       

 05-05-2008
4.00
wing kit delivered
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.